Wednesday, 22 June 2016

All Pair Testing

What is All pairs Testing?

All-pairs also known as pairwise testing is a testing approach taken for testing the software using combinatorial method. It's a method to test all the possible discrete combinations of the parameters involved.
Assume we have a piece of software to be tested which has got 10 input fields and 10 possible settings for each input field. Then, there are 10^10 possible inputs to be tested. In this case, exhaustive testing is impossible even if we wish to test all combinations.
Let us also understand the concept of All-pairs testing by taking an example.

Example

An application with simple list box with 10 elements (Let's say 0,1,2,3,4,5,6,7,8,9) along with a checkbox, radio button, Text Box and OK Button. The Constraint for the Text box is it can accept values only between 1 and 100. Below are the values that each one of the GUI objects can take:
List Box - 0,1,2,3,4,5,6,7,8,9
Check Box - Checked or Unchecked
Radio Button - ON or OFF
Text Box - Any Value between 1 and 100
Exhaustive combination of the application is calculated.
List Box = 10
Check Box = 2
Radio Button = 2
Text Box = 100

Total Number of Test Cases using Cartesian Method : 10*2*2*100 = 4000
Total Number of Test Cases including Negative Cases will be > 4000
Now, the idea is to bring down the number of test cases. We will first try to find out the number of cases using the conventional software testing technique. We can consider the list box values as 0 and others as 0 is neither positive nor negative. Radio button and check box values cannot be reduced. So each one of them will have 2 combinations (ON or OFF). The Text box values can be reduced into three inputs (Valid Integer, Invalid Integer, Alpha-Special Character).
Now, we will calculate the number of cases using software testing technique is 2*2*2*3 = 24 (including negative cases).
Now, we can still reduce the combination further into All-pairs technique.
Step 1 : Order the values such that one with most number of values is the first and the least is placed as the last variable.
Step 2 : Now, start filling the table column by column. List box can take 2 values.
Step 3 : The next column under discussion would be check box. Again, Check box can take 2 values.
Step 4 : Now, we need to ensure that we cover all combinations between list box and Check box.
Step 5 : Now, we will use the same strategy for checking the Radio Button. It can take 2 values.
Step 6 : Verify if all the pair values are covered as shown in the table below.
Text BoxList BoxCheck BoxRadio Button
Valid Int0checkON
Valid IntothersuncheckOFF
Invalid Int0checkON
Invalid IntothersuncheckOFF
AlphaSpecialCharacter0checkON
AlphaSpecialCharacterothersuncheckOFF

Result of Pair-Wise Testing

Exhaustive Combination results in > 4000 Test Cases.
Conventional Software Testing technique results in 24 Test Cases.
Pair Wise Software Testing technique results in just 6 Test Cases.

Getting Started with Agile Scrum Methodology: The Complete Guide for Software Developers and Testers

Introduction:
This is the guide for software developers and testers to understand and start working on the very famous Agile SCRUM methodology for software development and testing. Learn the basic but important terminologies used in Agile Scrum process along with a real example of the complete process.
SCRUM is a process in agile methodology which is a combination of Iterative model and incremental model.

One of the major handicaps of the traditional water-fall model was that – until first phase is complete, the application does not move to the other phase. And if by chance there are some changes in the later stage of the cycle, it becomes very challenging to implement those changes, as it would involve revisiting the earlier phases and redoing the changes.

Some of the key characteristics of SCRUM include:
  • Self-organized and focused team
  • No huge requirement documents, rather have very precise and to the point stories.
  • Cross functional team works together as a single unit.
  • Close communication with the user representative to understand the features.
  • Has definite time line of max 1 month.
  • Instead of doing the entire “thing” at a time, Scrum does a little of everything at a given interval
  • Resources capability and availability are considered before committing any thing.
To understand this methodology well, it’s important to understand the key terminologies in SCRUM.

Important SCRUM Terminologies:

1. Scrum Team
Scrum team is a team comprising of 7 with + or – two members. These members are a mixture of competencies and comprise of developers, testers, data base people, support people etc. along with the product owner and a scrum master. All these members work together in close collaboration for a recursive and definite interval, to develop and implement the said features.
2. Sprint
Sprint is a predefined interval or the time frame in which the work has to be completed and make it ready for review or ready for production deployment. This time box usually lies between 2 weeks to 1 month. In our day to day life when we say that we follow 1 month Sprint cycle, it simply means that we work for one month on the tasks and make it ready for review by the end of that month.
3. Product Owner
Product owner is the key stakeholder or the lead user of the application to be developed.
Product owner is the person who represents the customer side. He / she have the final authority and should always be available for the team. He / she should be reachable in case any one has any doubts that need clarification. It is important for the product owner to understand and not to assign any new requirement in the middle of the sprint or when the sprint has already started.
4. Scrum Master
Scrum Master is the facilitator of the scrum team. He / she make sure that the scrum team is productive and progressive. In case of any impediments, scrum master follows up and resolves them for the team.
5. User Story
User stories are nothing but the requirements or feature which has to be implemented. In scrum, we don’t have those huge requirements documents, rather the requirements are defined in a single paragraph, typically having the format as:
As a <User / type of user>
I want to <Some achievable goal / target>
To achieve <some result or reason of doing the thing>
For example:
As an Admin I want to have a password lock in case user enters incorrect password for consecutive 3 times to restrict unauthorized access.
There are some characteristics of user stories which should be adhered. The user stories should be short, realistic, could be estimated, complete, negotiable and testable.
Every user story has an acceptance criterion which should be well defined and understood by the team. Acceptance criteria details down the user story, provides the supported documents. It helps to further refine the user story. Anybody from the team can write down the acceptance criteria. Testing team base their test cases / conditions on these acceptance criteria.
6. Epics
Epics are equivocal user stories or we can say these are the user stories which are not defined and are kept for future sprints. Just try to relate it with life, imagine you are going for a vacation. Since you are going next week, you have everything in place like your hotel bookings, sightseeing, travelers check etc. But what about your vacation plan for next year? You have only a vague idea that you may go to XYZ place, but you have no detailed plan.
An Epic is just like you next year’s vacation plan, where you just know that you may want to go , but where, when, with whom, all these details you have no idea at this point of time.
In a similar way there are features which required to be implemented in future whose details are not yet known. Mostly feature begins with an Epic and then broken down to stories which could be implemented.
7. Product Backlog
Product backlog is a kind of bucket or source where all the user stories are kept. This is maintained by Product owner. Product backlog can be imagined as a wish list of the product owner who prioritizes it as per business needs. During planning meeting (see next section), one user story is taken from the product backlog, team does the brainstorming, understands it and refine it and collectively decides which user stories to take, with the intervention of the product owner.
8. Sprint Backlog
Based on the priority, user stories are taken from the Product Backlog one at a time. The Scrum team brainstorms on it, determines the feasibility and decides on the stories to work on a particular sprint. The collective list of all the user stories which the scrum team works on a particular sprint is called s Sprint backlog.

Sprint Backlog


9. Story Points:
Story points are quantitative indication of the complexity of a user story. Based on the story point, estimation and efforts for a story is determined. Story point is relative and is not absolute. To make sure that our estimate and efforts are correct, it’s important to check that the user stories are not big. Precise and smaller is the user story, accurate will be the estimation.
Each and every user story is assigned a story point based on the Fibonacci series (1, 2, 3, 5, 8, 13&21). Higher is the number, complex is the story.
To be precise
  • If you give 1 / 2 / 3 story point it means the story is small and of low complexity.
  • If you give points as 5 / 8, it is a medium complex and
  • 13 and 21 are highly complex.
Here complexity consists of both development plus testing effort
To decide a story point, brainstorming happens with in the scrum team and the team collectively decides a story point. It may happen that development team gives a story point of 3 to a particular story, because for them it may be 3 lines of code change, but testing team gives 8 story point because they feel this code change will affect larger modules so testing effort would be larger. Whatever story point you are giving, you have to justify it. So in this situation, brainstorming happens and the team collectively agrees to one story point.
Whenever you are deciding on a story point, keep the below factors in mind:
  • Dependency of the story with other application / module,
  • Skill set of the resource
  • Complexity of the story
  • Historical learning,
  • Acceptance criteria of the user story
If you are not aware of a particular story, don’t size it.
If you see that the story point is very high, further decompose it to smaller stories.
10. Burn down chart
Burn down chart is a graph which shows the estimated v/s actual effort of the scrum tasks.
It is a tracking mechanism by which for a particular sprint; day to day tasks are tracked to check whether the stories are progressing towards the completion of the committed story points or not.
Example: To understand this, check the below figure:

 http://cdn.softwaretestinghelp.com/wp-content/qa/uploads/2014/07/Burn-Down-chart-1.jpg

I have assumed:
  • 2 weeks Sprint ( 10 days)
  • 2 resources actual working on the sprint.
Story”-> Column shows the user stories taken for the sprint.
Task” -> Column shows the list of task associated to the user story.
Effort” -> Column shows the effort. Now; this measure is the total effort to complete the task. It does not depict the effort put in by any specific individual.
Day 1 – Day 10” -> – Column(s) shows the hours which are left to complete the story. Please see that the hour is NOT the hour which is already done BUT the hours which are still left.
Estimated Effort” -> is the total of the effort. For the “Start” it is simply the sum of the entire individual task: SUM (C5: C15)
Total number of effort that has to be completed in 1 day is 70 / 10 = 7. So at the end of day 1, the effort should reduce to 70 – 7 = 63. In a similar way it is calculated for all the days till day 10, when estimated effort should be 0 (Row 16)


Actual Effort Left” -> as the name suggests, is the effort actually left to complete the story. It may also happen that the actual efforts increases or decreases than the estimated one.
You can use the in build functions and Chart in Excel to create this burn down chart.
Burn Down Chart steps would be:
  1. Enter all the stories ( Column A5 – A15)
  2. Enter all the Tasks ( Column B5 – B15)
  3. Enter the Days ( Day 1 – Day 10 )
  4. Enter the starting efforts (Sum the tasks C5 – C15 )
  5. Apply formula to calculate the “Estimated Efforts” for each day (Day 1 to Day 10). Enter the formula at D15 (C16-$C$16/10) and drag it for all the days.
  6. For each day, enter the actual efforts. Enter the formula at D17 (SUM (D5:D15)) for summing up the actual efforts left, and drag it for all the other days.
  7. Select it and create the chart as follows:
 Burn Down chart 2
11. Velocity
Total number of story point which a scrum team archives in a sprint, is called Velocity. The Scrum team is judged or referenced by its velocity. Having said that, it should be kept in mind that the objective here is NOT achieving the maximum story points, but to have quality deliverable, respecting scrum team’s comfort level.
For example: For a particular sprint: total number of user stories are 8 having story points as
Scrum Velocity
So here the velocity will be the sum of the story points = 30
12. Definition of Done:
A story is DONE in Scrum, only when it is development and QA complete and the feature is eligible to be shipped to production.

Activities done in SCRUM Methodology:

#1: Planning meeting
Planning meeting is the starting point of SCRUM. It is the meeting where the entire scrum team gather, the product owner selects a user story based on the priority from the product back log and the team brain storms on it. Based on the discussion, the scrum team decides the complexity of the story and sizes it as per the Fibonacci series. Team identifies the tasks along with the efforts (in hours) which would be done to complete the implementation the user story.
Many a time planning meeting is preceded by a “Pre-Planning meeting”. It’s just like a home work which the scrum team does before they sit for the formal planning meet. Team tries to write down the dependencies or other factors which they would like to discuss in the planning meet.
#2: Execution of sprint tasks
As the name suggests, these are the actual work done by the scrum team to accomplish their task and take the user story into the “Done” state.
#3: Daily scrum meeting (call)
During the sprint cycle, every day the scrum team meets for, not more than 15 minutes (could be a stand up call, recommended to have during the beginning of the day) and state 3 points:
  1. What did the team member did yesterday
  2. What did the team member plan to do today
  3. Any impediments (roadblocks)
It is the Scrum master who facilitates this meeting. In case, any team member is facing any kind of difficulties, the scrum master follows up to get it resolved.
#4: Review meeting
At the end of every sprint cycle, the SCRUM team meets again and demonstrates implemented user stories to the product owner. The product owner may cross verify the stories as per its acceptance criteria. It’s again the responsibility of the Scrum master to preside over this meeting.
#5: Retrospective meeting
Retrospective meeting happens after the review meeting. The SCRUM team meets and discusses & document the following points:
  1. What went well during the Sprint (Best practices)
  2. What did not went well in the Sprint
  3. Lessons learnt
  4. Action Items.
The Scrum team should continue to follow the best practice, ignore the “not best practices” and implement the lessons learnt during the consequent sprints. The retrospective meeting helps to implement the continuous improvement of the SCRUM process.

How the Process is done? An example!

Having read about the technical jargons of SCRUM; let me try to demonstrate the whole process with an example.
Step #1: Let’s have a SCRUM team of 9 people comprising of 1 product owner, 1 Scrum master, 2 testers, 4 developers and 1 DBA.
Step #2: The Sprint is decided to follow 4 weeks cycle. So we have 1 month Sprint starting 5th June to 4th of July.
Step #3: The Product owner has the prioritized list of user stories in the product backlog.
Step #4: The team decides to meet on 4th June for the “Pre Planning” meeting.
  • The product owner takes 1 story from the product backlog, describes it and leaves it to the team to brainstorm on it.
  • The entire team discusses and communicates directly to the product owner to have clear understood of the user story.
  • In a similar way various other user stories are taken. If possible team can go ahead and size the stories as well.
After all the discussion, Individual team member go back to their work stations and
  • Identify their individual tasks for each story.
  • Calculate the exact number of hours on which they will be working. How the member concludes these hours; let’s check that
Total number of working hours = 9
Minus 1 hour for break, minus 1 hour for meetings, minus 1 hour for mails, discussions, troubleshooting etc.
So the actual working hours = 6
Total number of working days during the Sprint = 21 days.
Total number of hours available = 21*6 = 126
The member is on leave for 2 days = 12 hours (This varies for each member, some may take leave and some may not.)
Number of actual hours = 126 – 12 = 114 hours.
This means that the member will actually available for 114 hours for this sprint. So he will break down his individual sprint task in such a way that total of 114 hours is reached.
Step #5: On 5th of June the entire Scrum team meets for the “Planning Meeting”.
  • Final verdict of the user story from the product backlog is done and the story is moved to the Sprint back log.
  • For each story, each team member declares their identified tasks, if required can have a discussion on those tasks, can size or resize it (remember the Fibonacci series!!).
  • The Scrum master or the team enter their individual tasks along with their hours for each story in a tool.
  • After all the stories are completed, Scrum master notes the initial Velocity and formally starts the Sprint.
Step #6: Once the Sprint has started, based on the tasks assigned, each team member starts working on those tasks.
Step #7: The team meets daily for 15 minutes and discusses 3 things:
  • What did they do yesterday?
  • What they plan to do today
  • Any impediments (roadblocks)?
Step #8: The scrum master tracks the progress on daily basis with the help of “Burn down chart”
Step #9: In case of any impediments, the Scrum master follows up to resolve those.
Step #10: On 4th July, the team meets again for the review meeting. A member demonstrates the implemented user story to the product owner.
Step #11: On 5th July, Team meets again for the Retrospective, where they discuss
  • What went well?
  • What did not went well
  • Action Items.
Step #12: On 6th July, Team again meets for the pre-planning meeting for the next sprint and the cycle continues.
scrum agile methodology process
Tools that can be used for SCRUM activities:
There are many tools available which can be used extensively for tracking the scrum activities. Some of them include:

Conclusion:

In the beginning, people may face some difficulty to adopt this methodology, but through practice you will see SCRUM doing wonders. It keeps the resources very focused and you can actually see your application growing.
Many a time’s organization encourages team to have few hours as self-study and development as a scrum task and allocate few hours. During the review, team members also demonstrate what they have studied, and sometimes present any tool or application which they have developed. I personally appreciate this approach as it gives the people a chance to enhance their knowledge and also present their skills. (Well, I have learnt Selenium through this approach only! :) )

Ref - http://www.softwaretestinghelp.com/agile-scrum-methodology-for-development-and-testing/

Agile Testing

What is Agile Testing?

A software testing practice that follows the principles of agile software development is called Agile Testing. Agile is an iterative development methodology, where requirements evolve through collaboration between the customer and self-organizing teams and agile aligns development with customer needs.

Advantages of Agile Testing

  • Agile Testing Saves Time and Money
  • Less Documentation
  • Regular feedback from the end user
  • Daily meetings can help to determine the issues well in advance

Principles of Agile Testing

  • Testing is NOT a Phase: Agile team tests continuously and continuous testing is the only way to ensure continuous progress.
  • Testing Moves the project Forward: When following conventional methods, testing is considered as quality gate but agile testing provide feedback on an ongoing basis and the product meets the business demands.
  • Everyone Tests: In conventional SDLC, only test team tests while in agile including developers and BA's test the application.
  • Shortening Feedback Response Time: In conventional SDLC, only during the acceptance testing, the Business team will get to know the product development, while in agile for each and every iteration, they are involved and continuous feedback shortens the feedback response time and cost involved in fixing is also less.
  • Clean Code: Raised defects are fixed within the same iteration and thereby keeping the code clean.
  • Reduce Test Documentation: Instead of very lengthy documentation, agile testers use reusable checklist, focus on the essence of the test rather than the incidental details.
  • Test Driven: In conventional methods, testing is performed after implementation while in agile testing, testing is done while implementation.

Best Practices in Agile Testing

1. Automated Unit Tests
2. Test Driven Development
3. Automated Regression Tests
4. Exploratory Testing

Tuesday, 21 June 2016

Collaboration, abstraction, and other secrets of agile estimation

Collaboration, abstraction, and other secrets of agile estimation

Good estimation helps product owners optimize for efficiency and impact. That's why it's so important.

Estimation is hard. For software developers, it's among the most difficult–if not the most difficult–aspects of the job. It must take into account a slew of factors that help product owners make decisions that affect the entire team–and the business. With all that at stake, it's no wonder everyone from developers to upper management is prone to getting their undies in a bunch about it. But that's a mistake. Estimation is just that: an estimate. Not a blood-oath.
There's no requirement to work weekends in order to compensate for under-estimating a piece of work. That said, let's look at some ways to make estimates as accurate as possible.

Collaborating with the product owner

In agile development, the product owner is tasked with prioritizing the backlog–the ordered list of work that contains short descriptions of all desired features and fixes for a product. Product owners capture requirements from the business, but they don’t always understand the details of implementation. So good estimation can give the product owner new insight into the level of effort for each work item, which then feeds back into their assessment of each item's relative priority.
When the engineering team begins its estimation process, questions usually arise about requirements and user stories. And that's good: those questions help the entire team understand the work more fully. For product owners specifically, breaking down work items into granular pieces and estimates helps them prioritize all (and potentially hidden!) areas of work. And once they have estimates from the dev team, it's not uncommon for a product owner to reorder items on the backlog.

Agile estimation is a team sport

Involving everyone (developers, designers, testers, deployers... everyone) on the team is key. Each team member brings a different perspective on the product and the work required to deliver a user story. For example, if product management wants to do something that seems simple, like support a new web browser, development and QA need to weigh in because their experience has taught them what dragons may be lurking beneath the surface. Likewise, design changes require not only the design team's input, but that of development and QA as well. Leaving part of the broader product team out of the estimation process creates lower quality estimates, lowers morale because key contributors don't feel included, and compromises the quality of the software.
So don’t let your team fall victim to estimates made in a vacuum. It’s a fast track to failure!

Story points vs. hours

Traditional software teams give estimates in a time format: days, weeks, months. Many agile teams, however, have transitioned to story points. Story points rate the relative effort of work in a Fibonacci-like format: 0, 0.5, 1, 2, 3, 5, 8, 13, 20, 40, 100. It may sound counter-intuitive, but that abstraction is actually helpful because it pushes the team to make tougher decisions around the difficulty of work. Here are few reasons to use story points:
  • Dates don’t account for the non-project related work that inevitably creeps into our days: emails, meetings, and interviews that a team member may be involved in.
  • Dates have an emotional attachment to them. Relative estimation removes the emotional attachment.
  • Each team will estimate work on a slightly different scale, which means their velocity (measured in points) will naturally be different. This, in turn, makes it impossible to play politics using velocity as a weapon.
Teams starting out with story points use an exercise called planning poker. At Atlassian, planning poker is a common practice across the company. The team will take an item from the backlog, discuss it briefly, and each member will mentally formulate an estimate. Then everyone holds up a card with the number that reflects their estimate. If everyone is in agreement, great! If not, take some time (but not too much time–just couple minutes) to understand the rationale behind different estimates. Remember though, estimation should be a high level activity. If the team is too far into the weeds, take a breath, and up-level the discussion.

Estimate smarter, not harder

No individual task should be more than 16 hours of work. (If you're using story points, you may decide that, say, 20 points is the upper limit.) It’s simply too hard to estimate individual work items larger than that with a high degree of confidence. And that confidence is especially important for items at the top of the backlog. When something is estimated above your team's 16-hour (or 20-point) threshold, that's a signal to break it down into more granular pieces and re-estimate.
For items deeper in the backlog, give a rough estimate. By the time the team actually begins to work on those items, the requirements may change, and your application certainly will have changed. So prior estimates won’t be as accurate. Don’t waste time estimating work that is likely to shift. Just give the product owner a ballpark figure she can use to prioritize the product roadmap appropriately.

Learn from past estimates

Retrospectives are a time for the team to incorporate insights from past iterations–including the accuracy of their estimates. Many agile tools (like JIRA Software) track story points, which makes reflecting on and re-calibrating estimates a lot easier. Try, for example, pulling up the last 5 user stories the team delivered with the story point value 8. Discuss whether each of those work items had a similar level of effort. If not, discuss why. Use that insight in future estimation discussions.
Like everything else in agile, estimation is a practice. You'll get better and better with time.